Contractor Is Not Amused
Thanks to the contractor’s limitations and the inability to use the 30” vanity I’ve already purcahsed, we were forced to look for a new vanity, and generally redesign the bathroom for the upcoming renovation. I wonder how the contractor will deal with the fact that I think there will be less tile work, as now it seems that only the actual shower/tub area and floor will be tiled… In theory, it should speed up the job and drop the price… at least I can hope it will.